Derweze State Power Plant
-
Project TypePower Plant
-
LOCATIONDerweze/Turkmenistan
-
ConstractorGAP İnşaat
-
Date2013-2015
-
StatusCompleted
-
ClientMinistry of Energy and Industry of Turkmenistan
Derweze State Power Plant, which was implemented by GAP İnşaat under the leadership of Architect Metin Barut, in order to meet Turkmenistan's energy needs and build a sustainable energy future, was carried out under the leadership of the Ministry of Energy and Industry of Turkmenistan and in cooperation with General Electric.
This modern power plant located in Derweze is an important milestone in the energy sector of Turkmenistan. The power plant, designed with high efficiency and environmentally friendly approach, plays a critical role in sustainable energy production.
Equipped with General Electric's technological expertise, Derweze State Power Plant incorporates state-of-the-art equipment and smart systems. In this way, it is possible to increase efficiency in energy production and minimize environmental impacts.
Derweze State Power Plant, shaped by the aesthetic understanding and functional design of architect Metin Barut, is a turning point in Turkmenistan's energy sector. It stands out as an important step to ensure the country's energy security and contribute to sustainable development goals.
Project Gallery