Mary-Power-Station

Mary Electric Station

  • Project Type
    Energy Plant
  • LOCATION
    Mari/Turkmenistan
  • Construction Area
    10.477 m²
  • Project Area
    40.39 ha
  • Date
    2016-2018
  • Status
    Completed
  • CONTRACTOR
    GAP Construction
  • Client
    Turkmenistan Ministry of Energy and Industry

Mary Electric Station, which plays an important role in Turkmenistan's energy sector, was completed in 2018 by GAP İnşaat under the leadership of Architect Metin Barut. This large-scale project, carried out in cooperation with the Ministry of Energy and Industry of Turkmenistan, is designed to meet Turkmenistan's energy demand and support the country's development.

Mary Power Station is built on 40.39 hectares of land with an area of ​​10,477 square meters. This modern facility plays a critical role in securing Turkmenistan's energy needs and improving energy efficiency.

Designed in collaboration with a leading partnership such as General Electric, Mary Electric Station includes state-of-the-art equipment and smart systems. Designed to provide reliable and uninterrupted energy, this facility is a candidate to become an important strategic asset in Turkmenistan's energy sector.

Shaped by the aesthetic understanding and functional design of architect Metin Barut, Mary Electric Station plays an important role in Turkmenistan's energy future. This facility, which contributes to reliable energy supply and sustainable development goals, is on its way to becoming a reference point in the country's energy sector.

Mary Power Station continues to be Turkmenistan's preferred address for reliable energy supply and development.