+90 212 812 87 21

2024 MB Architects.

All Rights Reserved. © Spiart Creative Works

Senegal-Cap-Des-BICHES-Combined-Power-Plant-Project-(300-MW)

Senegal Cap Des BICHES Combined Power Plant Project (300 MW)

  • Project Type
    Power Plant
  • LOCATION
    Senegal
  • Date
    2022
  • Status
    On Going
  • Contractor
    Calik Energy

In order to meet Senegal's energy needs and strengthen the development of the country, the Cap Des BICHES Combined Power Plant project, led by Architect Metin Barut, was implemented in 2022 under the contractorship of Çalık Enerji.

This massive project is a milestone to meet Senegal's energy needs and support the country's sustainable development. While it strengthens Senegal's energy independence with its 300 MW capacity, it also represents an important step in the fields of environmental sustainability and renewable energy.

Senegal Cap Des BICHES Combined Power Plant stands out with its modern technology-based infrastructure and high efficiency. This power plant, which is a leader in clean and reliable energy production, provides energy in accordance with Senegal's environmental targets by minimizing environmental impacts.

At the same time, the project contributes to local economic development by increasing employment in the region and providing technical knowledge transfer. Senegal Cap Des BICHES Combined Power Plant is not just a power plant, but also an investment in the future of the country.

Senegal Cap Des BICHES Combined Power Plant, shaped by the aesthetic understanding and functional design of architect Metin Barut, is a turning point in Senegal's energy sector. Stepping into a strong energy future, this power plant sheds light on Senegal's development goals.

Project Gallery